A pre-season launch checklist for haunts
Six weeks out from opening night, here's the order of operations we use to get a haunt selling tickets without last-minute fire drills.
- #operations
- #launch
- #haunts
Opening night sneaks up. The attractions that have a calm launch aren’t lucky — they front-load the boring stuff. Here’s the sequence we run.
6 weeks out — money & dates
- Connect your Stripe account (payouts go straight to you).
- Lock your calendar: dates, time slots, capacity per slot.
- Decide ticket types: GA, timed entry, fast pass, group.
4 weeks out — the site
- Branded pages live: home, buy, FAQ, directions.
- Test checkout end-to-end with a real card in test mode.
- Set up discount/comp codes for sponsors and press.
3 weeks out — the crew
- Open the staff portal; invite managers first.
- Build the schedule and publish shifts.
- If you run the HR module: post applications, start onboarding.
2 weeks out — operations
- Load equipment and assets into the maintenance log.
- Print nightly open/close checklists.
- Dry-run the gate: scan a real QR ticket on a real phone.
Opening week — go live
- Flip the site public; announce the on-sale.
- Watch the dashboard on night one; adjust slot capacity if needed.
- Keep the box office ready for walk-ups.
Want this as a one-pager you can hand to your team? Grab the launch checklist guide.